UNIT SUPPORT
NOTE:
Unit nmst be level
_+ 2 degrees
{3/8 inch rise or fall per
foot of run (10 mm rise or fall per 305 mm of run) } or compressor
may not flmction
properly.
A. GROUND
LEVEL
INSTALLATION
The unit
must
be
level
and
supported
above
grade
by beams,
platform,
or a pad.
Platform
or pad
can be
of open
or solid
construction
but
should
be
of permanent
materials
such
as
concrete,
bricks, blocks, steel, or pressure-treated
timbers
approved
for ground
contact.
Soil conditions
must be considered
so that the
platform
or pad does not shift or settle and leave the unit partially
supported.
Minimum
pad dimensions
are shown
in Fig. 2.
If beams
or
an
open
platform
are
used
for
support,
it
is
recommended
that the soil be treated
or area be graveled
to reduce
the growth
of grasses and weeds.
To minimize
vibration
or noise
transmission,
it is recommended
that
supports
not
be
in
contact
with
the
building
structure.
However,
slabs on grade
constructions
with
an extended
pad are
normally
acceptable.
B. ROOF
TOP
INSTALLATION
This
type
of installation
is not
recommended
on wood
frame
structures
where low noise levels are required.
Supporting
structure
or platform
for the unit must
be level.
If
installation
is on a fiat roof,
locate unit minimum
6 inches
(152
ram) above roof level.
Place
the unit over one or more
load bearing
walls.
If there are
several
units,
mount
them
on platforms
that
are self-supporting
and
span
several
load
bearing
walls.
These
suggestions
are to
minimize
noise and vibration
transmission
through
the structure.
If
the structure
is a home
or apartment,
avoid
locating
the unit over
bedrooms
or study.
NOTE:
When unit is to be installed
on a bonded
guaranteed
roof,
a release
must
be obtained
from
the building
owner
to free the
installer
from all liatfilities.
C. FASTENING
UNIT
DOWN
If conditions
or local
codes require
the unit be attached
in place,
remove
the knockouts
in the base
pan and install tie down
bolts
through
the holes (see Fig. 2).
Contact
local distributor
for hurricane
hold-down
details
and the
P.E. (Professional
Engineer)
certification,
when required.
3/8" (10mm) dia. Tie Down Knockouts
In Basepan
(2 places)
I View From Top
I
Base
Pan
Depth
A
oO
Base Pan Width
Base Pan
W x D
23 x 23
(584 x 584)
25-11/16
x
25-11/16
(652 x 652)
31-1/8
x
31-1/8
(791 x 791)
A
7 - 6/4
(197)
9-1/16
(230)
Inches
(mm)
Tie Down
Knockouts
B
C
4-7/16
18
(113)
(457)
4-7/16
21-1/4
(113)
(540)
9-1/16
6-1/2
24-5/8
(230)
(165)
(625)
Minimum
Mounting
Pad
Dimensions
23 x 23
(584 x 584)
26 x 26
(660 x 660)
31-1/2 x 61-1/2
(800 x 800)
Fig. 2 - Tie Down
Knockouts
PROPERTY
DAMAGE
HAZARD
Failure
to follow
this
caution
may
result
in property
damage.
Inadequate
unit
support
may
cause
excessive
vibration,
noise,
and/or
stress
on the
refrigerant
lines,
leading
to
refrigerant
line failure.