General - Payne PG8JAA042090AAJA Installation And Operating Instructions Manual

Pg8m/pg8j -series c 80% afue gas furnaces
Table of Contents

Advertisement

Tab{e 10-GAS RATE (CU FTfHR)
SECONDS
SIZE OF TEST DIAL
SECONDS
SIZE OF TEST DIAL
FOR 1
1
2
5
FOR 1
1
2
5
REVOLUTION Cu Ft Cu Ft Cu Ft REVOLUTION Cu Ft Cu Ft Cu Ft
10
360
720
1800
50
72
144
360
11
327
655
1636
51
71
141
355
12
300
600
1500
52
69
138
346
13
277
555
1385
53
68
136
340
14
257
514
1286
54
67
133
333
15
240
480
1200
55
65
131
327
16
225
450
1125
56
64
129
321
17
212
424
1059
57
63
126
316
18
200
400
1000
58
62
124
310
19
189
379
947
59
61
122
305
20
180
360
900
60
60
120
300
21
171
343
857
62
58
116
290
22
164
327
818
64
56
112
281
23
157
313
783
66
54
109
273
24
150
300
750
68
53
106
265
25
144
288
720
70
51
103
257
26
138
277
692
72
50
100
250
27
133
267
667
74
48
97
243
28
129
257
643
76
47
95
237
29
124
248
621
78
46
92
231
30
120
240
600
80
45
90
225
31
116
232
581
82
44
88
220
32
113
225
563
84
43
86
214
33
109
218
545
86
42
84
209
34
106
212
529
88
41
82
205
35
103
206
514
90
40
80
200
36
100
200
500
92
39
78
196
37
97
195
486
94
38
76
192
38
95
189
474
96
38
75
188
39
92
185
462
98
37
74
184
40
90
180
450
100
36
72
180
41
88
176
439
102
35
71
178
42
86
172
429
104
35
69
173
43
84
167
419
106
34
68
170
44
82
164
409
108
33
67
167
45
80
160
400
110
33
65
164
46
78
157
391
112
32
64
161
47
76
153
383
116
31
62
155
48
75
150
375
120
30
60
150
49
73
147
367
---5
e Furnace
should cycle off within
2 minutes.
If gas does not
shut offwithin
2 minutes,
detem_ine
reason
&aft safeguard
switch
did not ffmction
properly
and correct
condition.
f\ Remove
blockage
fl'om furnace
vent elbow.
g. Switch
will autooreset
when it cools.
-->
h. Reoinstall
vent connector.
---5 NOTE:
Should
switch
remain
open
longer
than
3 minutes,
furnace
control board will lockout
the f:urnace for 3 hours. To reset
furnace
control
board, turn thermostat
below room temperature
or
from HEAT
to OFF and mrn
115v power
OFF,
then back
ON.
3. (hock
Pressure
Switch
This contlol
proves
operation
of the &aft inducer
blower.
a. Turn
off l!5ov
power
to fhrnace.
b. Disconnect
inducer
motor lead wires
from wire harness.
c. Turn
on 115or power
to furnace.
d. Set thermostat
to "call for heat"
and wait 1 minute.
When
pressure
switch
is flmctioning
properly,
hot surface
igniter
should
NOT
glow
and control
diagnostic
light flashes
a
--€
35
status
code 32. If hot surfSce
igniter
glows
when
inducer
motor
is disconnected,
shut down
furnace
immediately
e
DeteImine
reason
pressure
switch
did not function
properly
and con'ect
condition.
f\ Turn off 115or power
to ft_rnace.
g. Reconnect
inducer
motor
wires,
replace
outer
door,
and
turn on 115-v power.
h. Blower
will run for 90 sec befbre
beginning
the call fbr
heat again.
i. Furnace
should
ignite nom_ally.
Step
5--ChecHist
1
Put away tools and instruments.
Clean
up debris.
2. (hock
that blower
OFFoDELAY
time is selected
as desired.
3. Verii)
that
blower
and
burner
access
doors
are
properly
installed.
4
(ycle
test fhmac¢
with room thermostat.
5. (hock
operation
of accessories
per
manuitacturer's
instruc=
tions
6
Review
/ se*'s Guide with
owner
7
Attach
literature
packet
to fi/mace.
SERVBCE
AND
MAINTENANCE
PROCEDURES
FIRE,
INJURY,
OR DEATH
HAZARD
Failure
to fbllow this warning
could result in possible
damage
to this equipment,
serious
personal
injury,
or death
The ability- to properly
perform
maintenance
on this equip°
ment requires
certain knowledge,
mechanical
skills, tools, and
equipment.
If you
do not possess
these,
do not attempt
to
perform
any maintenance
on this equipment
other than those
procedures
recommended
in the User's
Manual.
ELECTRICAL
SHOCK,
FIRE,
OR EXPLOSION
HAZARD
Failure
to follow
this warning
could result
in personal
injury,
death,
or property
damage
Before
servicing_
disconnect
all electrical
power
to ftlmace
Verif)- proper
operation
after servicing.
ELECTRICAL
OPERATION
HAZARD
Failure
to fbllow
this caution
may result in improper
furnace
operation
or failure
of tim_ace
Label
all wires
prior
to disconnection
when
selwicing
con-
tIols
Wiring
errors
can
cause
improper
and
dangerous
operation.
Step
l--htroduction
GENERAL
These
instructions
are written
as if the furnace
is installed
in an
upflow
application.
An upflow
furnace
application
is where
the
blower
is located
below
the combustion
and controls
section of the
furnace,
and
conditioned
air is discharged
upward.
Since
this
ff_rnace can be installed
in any of the 4 positions
shown
in Fig
4,
you must
revise
your
orientation
to component
location
accord-
ingly.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents