INSTALLATION
5. Screw together the upper and lower
sections of the support frame at the
8. Insert the extractor hood over the
installation aids on the support frame.
9. Screw the extractor hood to the support
frame and screw back the panel.
6. Screw the support frame to the ceiling
with 4 screws.
T
11