Jenn-Air PRO-STYLE JGRP430WP01 Installation Instructions Manual page 9

30" (76.2 cm), 36" (91.4 cm) and 48" (121.9 cm) pro-style gas convection ranges
Hide thumbs Also See for PRO-STYLE JGRP430WP01:
Table of Contents

Advertisement

Available languages

Available languages

3. Drill two 1/8"(3.0 mm) holes that correspond
to the bracket
holes of the determined mounting method. See the following.
Floor Mounting
A
Wall Mounting
A. #12 x 1%" screws
B. Anti-tip bracket
A. #12 x 1%" screws
B. Anti-tip bracket
4. Using a Phillips screwdriver, mount anti-tip bracket to the wall
or floor with the two #12 x 1%" screws provided.
Depending on the thickness of your flooring, longer screws
may be necessary to anchor the bracket to the subfloor.
Longer screws are available from your local hardware store.
5. Move range close enough to opening to allow for electrical
connections to be made. Remove shipping base, cardboard
or hardboard from under range.
6. Continue installing your range using the following installation
instructions.
Explosion
Hazard
Use a new CSA International
approved
gas supply
line.
install
a shut=off valve.
Securely
tighten
all gas connections.
if connected to LP, have a qualified
person make sure
gas pressure does not exceed 14" (36 cm) water
column.
Examples
of a qualified
person include:
licensed heating personnel,
authorized
gas company personnel, and
authorized
service
personnel.
Failure to do so can result in death, explosion,
or fire.
1. Assemble flexible connector from gas supply pipe to pressure
regulator located in the middle rear of the range.
2. Apply pipe-joint compound
made for use with LP gas to the
smaller thread ends of the flexible connector adapters (see B
and G in the following illustration).
3. Attach one adapter to the gas pressure regulator and the
other adapter to the gas shutoff valve. Tighten both adapters.
4. Use a 1%d' combination
wrench and channel lock pliers to
attach the flexible connector to the adapters. Check that
connector is not kinked.
A
B
C
/
D
/
/
H
G
F
A. Gas pressure regulator
B. Use pipe-joint
compound.
C. Adapter (must have Y2"male
pipe thread)
D. Flexible connector
E. Manual gas shutoff valve
F V2" or 3/4"gas pipe
G. Use pipe-joint
compound.
H. Adapter

Advertisement

Table of Contents
loading

Table of Contents