Power down the server if performing a non-hot-plug installation or maintenance procedure
1.
down the
Extend the server from the rack (on page 20).
2.
Use the T-15 Torx screwdriver attached to the rear of the server to loosen the security screw on the
3.
hood latch.
Lift up on the hood latch handle, and then remove the access panel.
4.
Install the access panel
Place the access panel on top of the server with the hood latch open. Allow the panel to extend past
1.
the rear of the server approximately 1.25 cm (0.5 in).
Push down on the hood latch. The access panel slides to a closed position.
2.
Use the T-15 Torx screwdriver attached to the rear of the server to tighten the security screw on the
3.
hood latch.
Remove the PCI riser cage
CAUTION:
expansion slot covers, or blanks installed. If the server supports hot-plug components, minimize
the amount of time the access panel is open.
Power down the server (on page 20).
1.
Extend the server from the rack (on page 20).
2.
Remove the access panel (on page 21).
3.
Remove the PCI riser cage.
4.
server" on page 20).
For proper cooling do not operate the server without the access panel, baffles,
("Power
Operations 22