Step 13:
ROUTING THE PEC DEC CABLE:
Attach the metal ball end to the Left
Pec Dec Arm (26), route the cable
down and around pulley K2, over
and around pulley K3, down and
around pulley K4, then attach the
other metal ball end to the Right Pec
Dec Arm (27).
(See Fig K1, K2, K3, K4, K5)
K1
K4
K2
K3
K5
-22-
PEC DEC CABLE (39)
K1,K5
K2,K4
K3
A2