Step 11:
ROUTING THE AB CABLE:
Insert the cable's bolt end through
pulley A1 (ball outside), down and
around pulley A2, up and around pulley
A3, down and around pulley A4, up
and around pulley A5 and down to the
weigh stack. Screw the AB cable's bolt
end into the Select Rod (11) at least
7 threads.
(See Fig A1, A2, A3, A4, A5, A6)
A5
ball end
A3
A1
A4
A2
A6
AB CABLE (37)
A1
A3,A5
-20-
bolt end
A2
A4
A6