Step 9:
ROUTING THE TOP CABLE:
Assemble the cables and pulleys
simutaneously.
Insert the cable's bolt end through pulley T1
(ball outside), over pulley T2, down and around
pulley T3, down and around pulley T4, over and
around pulley T5, down and around pulley T6,
over and around pulley T7, down and around
pulley T8, over and around pulley T9 and down
to the weight stack. Screw the Top Cable bolt
end into the select Rod (11) at least 7 threads.
(See Fig T1, T2, T3, T4, T5, T6, T7, T8, T9, T10
& Fig 1, Fig 2)
T9
T7
T8
T10
ball end
T1
T2
T3
T4
T5
T6
TOP CABLE (36)
T1
T3,T5
T8
Fig1
-18-
bolt end
T2,T6
T4,T7,T9
T10
Fig2