Chapter 2 Hardware Installation; Pre-Hardware Installation; To Verify The Jumper Settings Of The Motherboard - JETWAY PT800DB User Manual

Intel socket 478 processor motherboard via pt800 + via 8237
Hide thumbs Also See for PT800DB:
Table of Contents

Advertisement

Hardware installation

2-1 Pre-Hardware installation

Before starting to use the computer with the motherboard installed the components on it, please
make sure complete the following steps:
1.
To verify the jumper settings of your motherboard
2.
To install the CPU and Cooling Kits
3.
To install the system memory
4.
To install the expansion cards
5.
To connect with ribbon cables, panel wires, and power supply
6.
To setup BIOS
7.
To install software driver & utility

2-2 To verify the jumper settings of the motherboard

(1) CMOS RAM Clear (3-pin) : JBAT
A battery must be used to retain the motherboard configuration in CMOS RAM short 1-2
pins of JBAT to store the CMOS data.
To clear the CMOS, follow the procedure below:
1.
Turn off the system and unplug the AC power
2.
Remove ATX power cable from ATX power connector
3.
Locate JBAT and short pins 2-3 for a few seconds
4.
Return JBAT to its normal setting by shorting pins 1-2
5.
Connect ATX power cable back to ATX power connector
Note: When should clear CMOS
1. Troubleshooting
2. Forget password
3. After over clocking system boot fail
Chapter 2
JBAT
1
3
1-2 closed Normal
CMOS RAM Clear Setting
7
JBAT
1
3
2-3 closed Clear CMOS

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pt800dbpPt800twinPt800dbz

Table of Contents