Heat & Glo NORTHSTAR-BK Owner's Manual page 29

Northstar epa certified woodburning fireplace
Hide thumbs Also See for NORTHSTAR-BK:
Table of Contents

Advertisement

D cut side of timer shaft must face
away from the Linkage Timer Arm
Figure 4.21
3. Place linkage control arm over timer shaft and tighten
set screw. Figure 4.22.
Tighten set screw
Figure 4.22
4. Rotate linkage control arm into final position and re-
attach to mounting plate. Note that the D cut is now
facing the linkage timer arm. Re-attach the linkage
timer arm. Figure 4.23
4/20/11
Heat & Glo • NorthStar EPA Fireplace • 480-1081E
2
3
4
5
4
5
3
6
Figure 4.23 Exploded View of Entire Assembly for Point of Refer-
ence only
Item
Description
1
Door Linkage
2
Linkage Control Arm
3
Bushing
4
Washer SAE #10
5
Screw 8-32 x 1/2 PH PHL TC
6
Linkage Timer Arm
7
Attachment Nut & Set Screw
8
Screw 6-32 x 1/4 PH PHL TC
9
Mounting Bracket
10
Timer, Mechanical, 12 hours
1
8
7
9
Qty
1
1
2
2
2
1
1
2
1
1
10
Page 29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Northstar-gtNorthstar-nt

Table of Contents