TOOLS REQUIRED:
1. FLAT BLADE SCREWDRIVER.
2. 3/4" WRENCH OR EQUIVALENT.
3. TOWEL.
PROCEDURE:
1. TURN OFF POWER AND WATER TO UNIT.
2. OPEN FRONT COVER AND EXPOSE PUMPHEAD.
3. REMOVE ACORN NUT. NOTE: DO NOT LOSE WASHER.
4. USE SCREWDRIVER AND TURN SCREW AS SHOWN. CLOCKWISE TO INCREASE PRESSURE, COUNTER
CLOCKWISE TO DECREASE PRESSURE. EACH 90° ROTATION WILL CHANGE PRESSURE ABOUT 25 PSI.
5. REPLACE WASHER (IF IT CAME OFF) AND ACORN NUT.
6. TURN ON WATER AND POWER AND THEN CHECK PRESSURE READING. REPEAT AS NECESSARY.
14693e - 31 Mar 03
PUMP
Millenium RO
(Pump Pressure Adjustment Procedure)
6 - 14
M illenium™ RO System by GE Osmonics
M
PRESSURE ADJ. SCREW
WASHER
ACORN NUT
DECREASE
INCREASE
Drawings