Vent Installation; Vent Terminations - Montigo R520 Installation, Operation & Maintenance Manual

Indoor c-view residential fireplace
Table of Contents

Advertisement

f i r e f e a t u r e

Vent Installation

Before installing the the rough-in kit on your roof or wall install the
electrical cord model EPVH-10 to model EPVH-100 and connect it to
the electrical control panel that was supplied with the fireplace. Do not
attach the electrical wire to the exterior of the vent.The vent will get
hot and may damage the wire.
Install the power vent rough-in kit in its predetermined location and
install the vent system from the rough-in kit to the fireplace. When the
vent is near the fireplace you should have a male end aiming towards
the fireplace connection which also has a male connection.

Vent Terminations

Selecting A Termination Location
Before installing the termination or venting, check to ensure the
planned termination location is acceptable and meets basic require-
ments shown in Figure 3, and Appendix A ( Termination Locations).
Installing the Residential's Terminations with Frame
Frame the termination opening for fireplace models, R520 and
1.
R620, Pages 6 to 9. (Vertical & Horizontal Vent Runs)
2.
Fasten the termination and its frame in place using a minimum of
4 screws, See Figure 2 below.
Vertical
EPVRR (Top Vent) Venting & Terminations, P. 5-7.
Horizontal
EPVRW (Wall Vent) Venting & Terminations, P. 7-9.
Power Vent Frame,
Min. 10"x 10" for 8"
10" (8" Vent)
Vent. 12"x 12"
12" (10 Vent)
"
Frame for 10" Vent
10" (8" Vent)
12" (10" Vent)
EPVRW
Horizontal
Installation Required.
Power Vent
Horizontal
Power Vent
Termination
Power Vent
Frame
Figure 2. Typical C-View Residential Vertical (Top Vent) Power
Vent Coaxial configuration.
Part No. XG0771 - 070111
EPVRR Vertical
Power Vent
Termination
Power Vent
12"Min Height
8" & 10" Vent
Slip Section
One run for
Horizontal or Vertical
C-View Residential R520-R620 Series Indoor Gas Fireplace
Installation
Vent terminations can be very hot. The termination is to be
installed higher than 7 feet above a public walkway.
Do not obstruct, or attempt to conceal, the vent termination.
These actions will affect the operation of the fireplace, and may be
hazardous.
In heavy snow areas, take extra care to prevent snow buildup
from obstructing the vent termination.
Locating the Power Vent Control Box
Locate the Power Vent Control Box in an accessible location. The
location should be where maintenance, adjustments and service may
be made easily.
Horizontal
Power Vent
Termination
110Vac 15A Supply
Current from
Distribution Panel
Wall Switch
Figure 2a. C-View Residential Series Control Box / Power Vent
Wire Routing Diagram
Cautions:
Vertical
Power Vent
Termination
One Control Cable Installation
required for either Horizontal
or Vertical Termination Vent
Control
Box
Power
Vent
Page 5

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

R620

Table of Contents