Montigo R520 Installation, Operation & Maintenance Manual page 8

Indoor c-view residential fireplace
Table of Contents

Advertisement

C-View Residential R520-R620 Series Indoor Gas Fireplace
Electrical Harness
Connector Location
Inset
Figure 4b. Installation of Rough-in Kit
Step 3.
Install the Power Vent Rough-in Kit. Pull wire harness through
the supplied hole in the bottom corner of the rough-in box, and
snap into the slot provided, (See figure 4b inset).
Figure 4c. (Fasten Rough-in Kit to framing)
Step 4.
Install fasteners around perimiter of Rough-in Kit. (Holes supplied
for ease of installation)
Figure 4d. (Installed Stainless steel cover)
Page 8
Installation
Power Vent
Rough-in Kit
Electrical Harness
Install Fasteners around
perimeter of Rough-in Kit
Step 5.
Install the Power Vent, Roof-top Stainless steel cover over the
Installed Rough-in Kit. (You can see the Electrical harness con-
nector in the top right corner).
Electrical Harness
from Power Vent
Figure 4e.
Step 6.
Install the Power Vent Module Power / communication harness.
Hold the Power Vent in close proximity of the assembled Chase,
(with stainless steel cover attached) and plug in the Power Vent
communication / Power Cord. (Note the direction and orientation
of the plug socket). (See Figure 4e & Figure 4f)
Install Power Vent Module
with Power / Communication
Harness
Figure 4g. (Installation of Power Vent Module)
Step 7.
Install the Power Vent Module. Place the Power Vent Module
over the stainless steel cover flange and vent pipe, aligning the
Power Vent into final position. Ensure the Harness is placed
down in the Rough-in box when placing the Power Vent Module.
The Power Vent will sit flush with the stainless steel cover if
installed correctly.
f i r e f e a t u r e
Figure 4f.
Vertical Roof Top
Power Vent
Vertical Roof Top
Power Vent Rough-in
Kit
Part No. XG0771 - 0070111

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

R620

Table of Contents