Installation Preparation; Electrical Requirements; Install Junction Box - GE Advantium PSB1200BB Installation Instructions Manual

120v built-in speedcook ovens
Hide thumbs Also See for Advantium PSB1200BB:
Table of Contents

Advertisement

ELECTRICAL REQUIREMENTS

Single Advantium 120 Installation:
This product requires a 120-volt, 60 Hz, 15-amp circuit
and draws 1.8 kilowatts. This product must be
connected to a supply circuit of the proper voltage
and frequency.
• Wire size must conform to the requirements of the
National Electrical Code or the prevailing local code
for this kilowatt rating.
• The power supply cord and plug should be brought
to a separate 15 or 20 ampere branch circuit single
grounded receptacle. The outlet box should be
located within reach of the 48" power cord.
ELECTRICAL LOCATION
Locate outlet box in the shaded area
Install a recessed electrical outlet in the back wall
of the opening within 6" of either side and at least
9" above the cutout floor.

Installation Preparation

6"
9"
IMPORTANT: (Please read carefully).
The power cord of this appliance is equipped with
a three-prong (grounding) plug that mates with
a standard three-prong grounding wall receptacle
to minimize the possibility of electric shock. The
customer should have the wall receptacle and
circuit checked by a qualified electrician to make
sure the receptacle is properly grounded and has
the correct polarity.
• Where a standard two-prong wall receptacle is
encountered, it is the personal responsibility and
obligation of the consumer to have it replaced with
a properly grounded three-prong wall receptacle.
Do not, under any circumstances, cut or remove
the third (ground) prong from the power cord.
DO NOT USE AN EXTENSION CORD.
4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents