4. Install the two outer rail subassemblies in the rack using twelve 10-32x1/2" SEMS screws or other
appropriate fasteners. If bar-nuts are used, they should be installed such that all threads are aligned
vertically, ensuring the center hole is not skewed with respect to the holes on the rack rail.
NOTE
If mounting a 1U system in a 1U confined space, four 2U bar-nuts are included to replace the
1U bar-nuts. The 2U bar-nuts need to be installed in the 1U space either above or below the
1U space where this kit is being mounted. When installing multiple 1U systems, the 2U bar-
nuts should be used in the next to last kit.
NOTE
L-Brackets should be adjusted front-to-back to fit rack channel depth.
Figure 1-14.
Installing the Outer Rails
14
HP Universal Rack Mount Kit (with Stop Feature) for 19-23 in. 2- and 4-Post Racks
Installation Instructions