The Graph above depicts the relationships of air exchange to time and CO ppm with cubic feet area and percent
CO emissions remaining constant.
Based on the CO production rates shown above the TWA would not be exceeded in a 100 x 750 x 10 foot (empty)
space after 8 hours with 2 air changes per hour. (Assumes no additional CO exposure during 8 hour time period)

MAINTENANCE OF EQUIPMENT

The proper maintenance of equipment is vital to safe operation. LPG engines are dependent on engine tune up,
and air filter replacement CO concentration (production) skyrockets when the air to fuel ratio becomes fuel rich.
Follow the recommended Maintenance Schedule for the engine found in the Engine Operator/Owner Manual as
well as the Maintenance And Adjustments schedule found in the Propane Floor Equipment Operator's Manual
that were supplied with the equipment. Additional manuals may be obtained by contacting;
Windsor Industries at: 1-800-456-6649 or write to: Windsor●1351 W. Stanford Ave. ●Englewood CO●80110

CO SAFETY EQUIPMENT AVAILABLE

Three-way type catalytic converter to scrub CO, Hydro Carbons (HC), and Nitrous Oxide (NOx) from
the engine exhaust providing the lowest possible emissions
High cubic feet per minute (PM) fans (forced air mixing)
Digital combustion analyzers for tail pipe emissions monitoring