Testing The Connections - Nvidia Frame Synchronization User Manual

Table of Contents

Advertisement

C
2
HAPTER
NVIDIA Frame Synchronization

Testing the Connections

To test the connections, click Initialize Link on the Server control panel.
The Sync and connection status group box displays the status of the sync signals as well
as the status of the RJ45 ports. The two ports are represented by connector icons. See
Figure
.
Figure 2.10
18
2.10.
The connector is receiving the sync signal from another card.
In
The connector is sending the sync signal to another card.
Out
Sync and Connection Status
Quadro FX 3000G
The panel icon layout
corresponds to the layout
of the physical connectors.
Frame Synchronization User's Guide– Version 3.0
Quadro G-Sync
NVIDIA Corporation

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Forceware graphics drivers frame synchronization

Table of Contents