Power-On Sequence; Figure 4.3 Power-On Operation Sequence - Fujitsu MHV2060AT Product Manual

Fujitsu computer drive user manual
Hide thumbs Also See for MHV2060AT:
Table of Contents

Advertisement

Theory of Device Operation

4.4 Power-on Sequence

Figure 4.3 describes the operation sequence of the disk drive at power-on. The
outline is described below.
a) After the power is turned on, the disk drive executes the MPU bus test,
internal register read/write test, and work RAM read/write test. When the
self-diagnosis terminates successfully, the disk drive starts the spindle motor.
b) The disk drive executes self-diagnosis (data buffer read/write test) after
enabling response to the ATA bus.
c) After confirming that the spindle motor has reached rated speed, the head
assembly is loaded on the disk.
d) The disk drive positions the heads onto the SA area and reads out the system
information.
e) The drive becomes ready. The host can issue commands.
f)
The disk drive executes self -calibration. This collects data for VCM torque
and mechanical external forces applied to the actuator, and updates the
calibrating value.
Power-on
a)
Self-diagnosis 1
- MPU bus test
- Internal register
write/read test
- Work RAM write/read
test
The spindle motor starts.
b)
Self-diagnosis 2
- Data buffer write/read
test
c)
Confirming spindle motor
speed
Load the head assembly
4-6
Start

Figure 4.3 Power-on operation sequence

d)
Initial on-track and read
out of system information
e)
Drive ready state
(command waiting state)
f)
Execute self-calibration
End
C141-E218

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mhv2100atMhv2120atMhv2040atMhv2080at

Table of Contents