Power-On Sequence; Idd Operation Sequence At Power-On - Fujitsu MAB3091FC Series Maintenance Manual

Disk drives fibre channel interface
Table of Contents

Advertisement

5.4

Power-On Sequence

Figure 5.3 shows the operation sequence of the IDD at power-on. The processes shown in this
figure are explained below:
1) After the power is turned on, the IDD executes self-diagnosis 1 (MPU bus test, internal
register write/read test, and work RAM write/read test).
2) When self-diagnosis 1 terminates successfully, the IDD activates the spindle motor when
the motor start mode is set (SW1 is on; default setting at factory shipment).
3) The IDD executes self-diagnosis 2 (data buffer write/read test).
4) The IDD receives the START UNIT command, then the IDD activates the spindle motor
when the motor start mode is set. When the motor start mode is not set, the IDD
terminates this sequence and enters the command waiting state.
5) The IDD checks that the spindle motor rotation reaches a steady rotational speed.
6) The IDD executes self-configuration. This includes execution of the factory calibration
which is described on the next page and the processing of reading the format information
and defect position information written in the system zone.
7) The disk drive is in ready state and commands from the host system can be executed.
Power-on
Start
Self-diagnosis 1
(1)
• MPU bus test
• Internal register
write/read test
• Work RAM write/read
test
Motor start mode
(2)
switch setting
Activate spindle motor
Self-diagnosis 2
(3)
• Data buffer write/read
test
5 - 6
OFF
ON
Figure 5.3

IDD operation sequence at power-on

C141-F028-01EN
Motor start mode
(4)
switch setting
ON
Check spindle motor
(5)
steady state rotation
(6)
Execute self-calibration
Drive ready state
(7)
(command waiting state)
End
OFF

Advertisement

Table of Contents
loading

Table of Contents