UNI-T UT71A Operating Manual page 44

Hide thumbs Also See for UT71A:
Table of Contents

Advertisement

Note
l
The requirement of Input amplitude "a" is as follows:
When 10Hz~40MHz: 200 mV
>40MHz:
Un-specified
l
When Hz measurement has been completed,
disconnect the connection between the testing leads
and the circuit under test and remove the test leads
away from the input terminals.
42
a
30Vrms;
Model UT71A/B: OPERATING MANUAL

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ut71b

Table of Contents