Step 2 Framing The Fireplace - Heat-N-Glo 8000 DVTFL Installer's Manual

Table of Contents

Advertisement

For Horizontal Sections
Top
3 inches
(75 mm) (25 mm) (25 mm)
Step 2
Framing the
Fireplace
CAUTION
The framing
headers may
rest on the
fireplace
stand-offs.
Figure 5. Framing Dimensions
7
Minimum Clearances from the Vent Pipe to
Combustible Materials
For Vertical
Bottom
Sides
1 inch
1 inch
For minimum clearances, see the direct vent
termination clearance diagrams on pages 25 and 27 in
this section.
Fireplace framing can be built before or after the
fireplace is set in place. Framing should be positioned
to accommodate wall coverings and fireplace facing
material. The diagram below shows framing reference
dimensions.
MEASURE FIREPLACE DIMENSIONS, AND
VERIFY FRAMING METHODS AND WALL
COVERING DETAILS, BEFORE FRAMING
CONSTRUCTION BEGINS.
Model
8000DVTFL
6000DVTFL & 6000XLT 42
6000ARCH
SL-42DVT
NOTE: DIMENSIONS SHOWN IN INCHES
*SURROUND IN FRONT OF FINISHED WALL
**SURROUND FLUSH WITH FINISHED WALL
Sections
Top
1 inch
2-1/2 inches 1/2 inch
(25 mm)
(63.7 mm) (13 mm) (25 mm)
Framing should be
constructed of 2 X 4
lumber or heavier.
A
B
C
49
42-3/8
25-3/8
38-1/4
22
42*
42-3/8
22
48-1/4**
49
42-7/8
17
At Wall Firestops
Bottom
Sides
1 inch
B
C
A
D
47
43-1/4
53-5/8
45-3/4

Advertisement

Table of Contents
loading

This manual is also suitable for:

6000 dvtfl6000 xlt6000 archSl-42 dvt

Table of Contents