Preparing The Tool - Porter-Cable FN250B Instruction Manual

Finish nailer
Hide thumbs Also See for FN250B:
Table of Contents

Advertisement

PREPARING
THE TOOL
1. After reading and understanding
this entire manual,
connect tool to
air supply (Fig. 18).
[]
DANGER: Never point tool at yourself or others in work area.
• Always connect tool to air supply before loading fasteners (Fig. 18).
• Do not load fasteners with trigger or safety depressed.
• Only use approved
Porter-Cable
fasteners.
• Operator and others in work area MUST wear safety glasses with side
shields.
Always
wear ANSI Z87.1
approved
safety
glasses,
and
hearing protection when preparing or operating the tool.
• Never use a tool that is leaking air, has missing or damaged parts, or
requires repair.
2. Pull follower (A) Fig. 19 all the way to the rear, until it latches.
3. Insert a strip of approved fasteners (Fig. 20). Orient fasteners (Fig. 20A)
with points down. Slide fasteners forward to the front of the magazine. The
magazine will hold two full strips of fasteners.
IMPORTANT:
Fasteners
must
point
in the same direction
as
Fig.t8
they will be driven.
4. Depress follower
release lever (A)
Fig. 21, allowing the follower to slide
forward against the fasteners.
Fig. 20
Fig. 20A
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents