Electrical Connection - GE Zoneline 4100 Owner's Manual

Heat/cool and heat pump models
Table of Contents

Advertisement

Available languages

Available languages

Installation
Instructions
MAKE
IT1REMOVE JUNCTION BOX
1. Remove the junction
box cover by removing the front
two screws.
2. Remove the junction
box by removing the top and
bottom rear screws. Note how the tabs on the lower
left side of the junction
box serve to hold the side in
place. This will help when the box is being reinstalled.
Unit connector
ELECTRICAL CONNECTION TO THE UNIT
[_ ATTACH CONDUIT
1. Usethe round knockout at the bottom of the junction box
to attach conduit coming from the branch circuit.
Remove the knockout, attach the conduit and bring wires
into the junction box. Leave 6" of wire free at the end of
the conduit to allow connections to be made.
[
ndu_t
_
Juncti0n
box
Junction
box cover
D CONNECT THE CORDSET
Plug the connector,
provided in the Direct Connect Kit,
fully into place in the unit mating connector.
Be sure
the locking tabs at the sides are engaged.
i
NOTE: Order Kit RAK4OO2CW to enable a quick
i
disconnect
inside the junction
box.
!
2. If a fuse and fuseholder are to be used, the
knockout at the top of the box is for mounting
a Buss fuseholder. Be sure the fuse and fuseholder
are of the same rating as the branch circuit.
Leadwires at the fuse can be either soldered in place
or attached using UL-listed 1/4" female (receptacle)
crimp connectors. Follow local codes.
REINSTALL JUNCTION
BOX
* Reinstall the junction
box by engaging the left tabs
on the lower right face of the unit, aligning the screw
holes at the top and bottom and driving the two
screws until secure. Be sure that all wire leads are
inside the box and not pinched between the box and
the unit. The green insulated ground wire from the unit
MUSTbe connected to the branch circuit ground wire.
Make all wire connections by using appropriate
UL-listed electrical connectors and techniques
(black to black, white to white and green to green).
D REINSTALLJUNCTION BOX COVER
1. Carefully tuck all wires and connections back inside
the junction
box. Be sure there are no loose
connections or stray uninsulated wires exposed.
2. Place the junction
box cover in place. Replace the two
screws removed earlier and tighten securely.
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zoneline 6100

Table of Contents