Electrical Connection - GE Zoneline AZ45 Owner's Manual And Installation Instructions

Hide thumbs Also See for Zoneline AZ45:
Table of Contents

Advertisement

230/208 VOLT ELECTRICAL CONNECTION OPTIONS
POWER
CORD CONNECTION
Depending on application, a power supply kit with LCDI
must be used to supply power to the Zoneline unit. The
appropriate kit is determined by the voltage, the means of
electrical connection and the amperage of the branch
circuit.
Power supply kit
(Appearance may vary)
Connections of 208 or 230-volt circuits may be with a
power supply kit or a junction box kit.
All wiring, including installation of the receptacle,
must be in accordance with the NEC and local codes,
ordinances and regulations. Codes require the use of
an arc fault or leakage current detection device on the
power cord except direct connect. Be sure to select the
correct cord for your installation.
Tandem
Perpendicular
15 Amp
20 Amp
230/208 volt receptacle configuration
Branch Circuit and
Unit Amperage Rating
15
20
30
*Not approved for use on 7000 BTU models.
Installation Instructions
Large Tandem
30 Amp
Proper GE Power Cord
with LCDI Device
RAK315P
RAK320P
RAK330P*
Power cords may include an arc fault interruption
or a leakage current detection interruption device.
A test and reset button is provided on the plug case
or the inline case. The device should be tested on
a periodic basis by first pressing the TEST button
and then the RESET button. If the TEST button does
not trip or if the RESET button will not stay engaged,
discontinue use of the Zoneline and contact a
qualified service technician.
ELECTRICAL SUBBASE
CONNECTION
230/208-volt models may be installed using one
of the following electrical subbases:
Branch Circuit and
Unit Amperage Rating
15
20
30
*Not approved for use on 7000 BTU models.
Electrical subbases provide an enclosure for direct
connection or enclosed receptacles. The subbase kit
includes the power cord.
The instructions provided with the selected subbase kit
must be carefully followed. It is the responsibility of the
installer to ensure the connection of components is done
in accordance with these instructions and all electrical
codes.
If using a sub-base connection, the RAK4002C Junction
Box is also necessary for a complete installation.
16
Proper GE
Subbase Kit
RAK204D15PA
RAK204D20PA
RAK204D30PA*

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zoneline az65

Table of Contents