Chapter 2: Hardware Installation; Precautions - Extreme Networks Altitude 3500 Series Product Reference Manual

Software version 2.6
Table of Contents

Advertisement

2
C H A P T E R
An access point installation includes mounting the access point, connecting the access point to the
network (LAN or WAN port connection), connecting antennas and applying power. Installation
procedures vary for different environments. See the following sections for more details:
Precautions on page 35
Requirements on page 37
Access Point Placement on page 37
Power Options on page 39
Power Tap Systems on page 40
Mounting an Altitude 3510 on page 41
Altitude 3510 LED Indicators on page 48
Mounting an Altitude 3550 on page 49
Altitude 3550 LED Indicators on page 54
Setting Up MUs on page 54
CAUTION
Extreme Networks recommends conducting a radio site survey prior to installing an access point. A site
survey is an excellent method of documenting areas of radio interference and providing a tool for device placement.

Precautions

Before installing an Altitude 3510 or Altitude 3550 model access point verify the following:
Do not install an Altitude 3510 or Altitude 3550 in wet or dusty areas without additional protection.
Contact an Extreme Networks representative for more information.
For the models Altitude 3510 and Altitude 3550 check the following:
Verify the environment has a continuous temperature range between -20 °C to 50 °C for Altitude
3510.
Verify the environment has a continuous temperature range between -30 °C to 55 °C for Altitude
3550.
Altitude 3500 Series Access Point Product Reference Guide
Hardware Installation
35

Advertisement

Table of Contents
loading

Table of Contents