INSTALLING
THE FRONT
RAIL
See Figures 15, 16, and 17.
•
Locate the front rail, the switch assembly, and the
following hardware:
6 square head bolts (5/16-18 x 1 in.)
6 flat washers (5/16 in.)
6 hex nuts (5/16o18)
Right and left end caps for front rail
4 screws (5/32-32 x 1/2 in.) for end caps
•
Set aside the end caps and four screws until the
channel separator and the switch have been
installed.
•
Insert the six square head bolts into the table and
extensions, so the bolt heads extend out 1/2 in.
•
Loosely attach a flat washer and a hex nut to each
bolt. See Figure 15.
•
The back of the rail has two slots. See Figure 16,
Slide the upper slot over the bolts, (Bottom slot is
for switch.)
•
Align the rail left to right - Match the 6-7/8 in. mark
on the right scale to the right edge of the saw base
(main table). See Figure 17.
•
Snug the rail against table. Finger-tighten each nut
on the table and extensions.
SCALE
FRONTRAIL
HEIGHT
HANDWHEEL
SQUAREHEAD
BOLT_
HEXNUT
FLATWASHER
Fig. 15
RAIL SLOT
HEXNUT
FRONTRAIL
Fig. 16
TABLETOP VIEWEDFROMABOVE
EXTENSION
"_
__
6-7/8 I
HTSCJ
in, MARKRIG
FRONTRAIL _
Fig. 17
INSTALLING
THE SEPARATOR
CHANNEL
See Figure 18.
The separator channel keeps the front and rear rails
straight. Separator channel must be properly installed
to prevent workpiece from binding.
•
Locate the separator channel and the following
hardware:
4 brackets
4 square head bolts (5/16-18 x 1 in.)
8 hex bolts (5/16-18 x 3/4 in.)
12 hex nuts (5/16 in.)
•
Place the brackets on the channel, aligning the
holes. Install the hex head bolts in the pair of holes
on each bracket. From inside the channel, add a
hex nut and finger tighten.
•
Install the square head bolts in the single slots on
the end of each bracket. Add the nuts and partially
tighten, leaving a small gap between the bolt and
the bracket.
23
rRR FYSH RN" TABLE SAW315.228510