Install The Header Bracket - Craftsman 139.5399211 Owner's Manual

1/2 hp garage door opener
Hide thumbs Also See for 139.5399211:
Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION
STEP
2
Install
the Header
Bracket
You can attach the header bracket either to the wall
above the garage door, or to the ceiling. Follow the
instructions which will work best for your particular
requirements.
Do not install the header bracket
over drywall. If installing into masonry, use
concrete anchors (not provided).
WALL HEADER BRACKET INSTALLATION
• Center the bracket on the vertical centedine with
the bottom edge of the bracket on the horizontal
line as shown (with the arrow pointing toward the
ceiling).
• Mark the vertical set of bracket holes (do not use
the holes designated for ceiling mount). Drill 3/16"
pilot holes and fasten the bracket securely to a
structural support with the hardware provided.
HARDWARESHOWNACTUALSIZE
Lag Screw
5/16"-9xl-5/8"
Wall Mounting
Holes
Optional
Wall Mounting
Holes
Hiagrhag_et
Po°inrt T °rfavel
The nail hole is for
_ positioning
only.
You must use lag screws
to mount the header bracket.
Door
Vertical
Centedine
CEILING HEADER BRACKET INSTALLATION
• Extend the vertical centeriine onto the ceiling as
shown.
• Center the bracket on the vertical mark, no more
than 6" (15 cm) from the walt. Make sure the arrow
is pointing away from the wall. The bracket can be
mounted flush against the ceiling when clearance
is minimal.
• Mark the side holes. Drill 3/16" pilot holes and
fasten bracket securely to a structural support with
the hardware provided.
Ceiling Mounting Holes
Maximum
Door
/
1/
_
- Finished Ceiling -
/f
_//Header
VerticaICentedine
Bracket
Lag Screws
5/16"-9xl -5/8"
The nail hole is for
positioning
only.
You must use lag screws
to mount the header bracket.
Header Wail
13

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents