Wiring Diagram; Regency P121-1/P121Lc-1/P121Rc-1/P131-1 Zero Clearance Direct Vent Gas Fireplace - Regency P121-NG1 Owners & Installation Manual

P121 / p121lc / p121rc / p131 zero clearance direct vent gas fireplace
Table of Contents

Advertisement

No electrical power supply is required for the
gas control to operate. 120 Volt AC power is
needed for the fan switch and blower. The fan
can be hard wired if desired. A terminal block
is provided on the left hand side of the unit. A
Lockwasher
Star washer
#8 Ground Lug
(for mobile home)
Nut
Ground Wire
Grounding Lug Detail
To Burner
ON / OFF
Red
Switch
Black
CAUTION: Label all wires prior to disconnection when servicing controls.
Wiring errors can cause improper and dangerous operation.

Regency P121-1/P121LC-1/P121RC-1/P131-1 Zero Clearance Direct Vent Gas Fireplace

WIRING DIAGRAM

three wire power cord can also be used and
plugged into a suitable receptacle.
(Do not cut the ground terminal off under
any circumstances.)
Pilot
Assembly
Piezo
Ignitor
(To THTP)
(To TH)
ON OFF
Remote Receiver
Remote Transmitter
or Thermostat
(Millivolt) (Optional)
Caution: Ensure that the wires do
not touch any hot surfaces and are
away from sharp edges.
Green (Ground)
120 VAC
White (Neutral)
60HZ
Black (Live)
(*by others)
(*by others)
ON OFF
(*Supplied by others - install
according to local code)
Brown
White
To Thermocouple IN
(Optional)
Terminal Block Location
Remove cover to ac-
cess Terminal Block
INSTALLATION
White
FAN 1
Black
Black
Thermodisc
"S.I.T" Valve
Terminal Block
FAN 2
Gas
In
29

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents