Locate the hardware accessory box packed
with range hood and check contents.
Step
Check
Installation
Heat Lamp(s)
Hardware
(on some models)
3
We recommend that the vent hood
and/or duct cover be on site before
S tep
final framing and wall finishing to
more accurately locate the ductwork
and electrical service.
Construct
Soffit
NOTE: If the top of the installation
location does not meet the soffit, use
Framing
a 6" or 12" duct cover accessory to
conceal the duct run.
INSTALLATION
• The soffit should be constructed
UNDER A SOFFIT
with 2x4's.
(SKIP THIS STEP
• Determine the installation location.
IF SOFFIT IS NOT
USED.)
48" Models
36" Models
30" Models
• Refer to step 4 for mounting screw
locations.
• Mark the centerline of the installation.
• Add additional 2 x 4 studs at the loca-
tions illustrated.
• For 48" models, allow 10" deep mini-
mum opening below the soffit to accom-
modate ductwork. For 30" and 36"
models, allow 7" deep minimum opening.
B
"A"
"B"
Centerline to
Opening Depth
Stud Inner Edge
for Ductwork
11-1/4"
10" Min.
8-3/4"
7" Min.
10-11/16"
7" Min.
Installation
Professional Vent Hoods
Halogen
Bulbs
Finished Drywall
• Cut 2 wood shims, 2" x 10" X
(drywall thickness). Secure to the
bottom of the horizontal studs,
flush with the front, as illustrated.
NOTE: If drywall is present, cutaway
enough to expose studs.
Grease
Tray(s)
Shims
Filter(s)
8