Recommended Procedures For New And Existing Stacks - Enterasys A2H124-24FX Hardware Installation Manual

Enterasys networks ethernet switches hardware installation guide
Hide thumbs Also See for A2H124-24FX:
Table of Contents

Advertisement

Configuring Switches in a Stack
3.
The management election process uses the following precedence to assign a 
management switch:
a.
b. Management assigned priority (values 1–15)
c.
d. Highest MAC Address

Recommended Procedures for New and Existing Stacks

The following procedures assume that all switches have a clean configuration from manufacturing.
When adding a new switch to an already running stack, it is also assumed that the new switch is
using the same firmware image version as other switches in the stack.
Installing a New Stackable System of Up to Eight Switches
Use the following procedure to install a new stack of up to eight switches out of the box. 
Before applying power, make all physical connections with the stack cables as described 
in "Connecting Stacking Cables" on page 3‐11.
1.
Once all of the stack cables have been connected, individually power on each switch 
from top to bottom (connecting power to a switch is described in "Connecting AC and 
RPS‐SYS Power" on page 3‐16).
If the switches are powered on almost simultaneously, the system will automatically 
select the first one that powers up as the Master switch and the others as Member 
switches. The switches are assigned unit IDs in the order that they become fully 
operational.
You can control the unit ID assignment according to the physical position in a stack. 
When you power up each switch and allow it to become fully operational before 
applying power to the next switch, the first one becomes the Manager and all the next 
switches will join that stack (regardless of Priority, Firmware Revision, or MAC 
Address). The switches are assigned unit IDs in the order that you power on each 
switch.
2.
(Optional) If desired, change the management switch using the set switch 
movemanagement command as described in the SecureStack A2 Configuration Guide.
3-14 Hardware Installation
Previously assigned/elected management switch
Hardware preference level
Note: Once switch IDs are assigned, they are persistent and will be retained during a
power cycle to any or all of the switches.
Important

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Securestack a2 a2h124-24fx

Table of Contents