CHECKING
THE POWER
SUPPLY
If the output
light
remains
out with the collector
cells removed
from the
cabinet,
the power supply
is defective.
Specific
problems
on the power tray
assembly
can be isolated
by using a multimeter
and high voltage
probe to
check the output voltages.
To check
the secondary
circuit,
a high voltage
meter is required.
See the
section
entitled
RECOMMENDED
SERVICE
TOOLS.
To check
for proper
operation,
it is imperative
that the procedure
be followed
as outlined
below:
1. Make sure the furnace
blower
is operating,
the control
switch is on and
input voltage
is 120 volts, 60 Hz.
2. Remove
front door assembly
panel.
3. Remove
power pack access cover.
4. Check the high voltage contact
board assembly(s)
for damage
or carbon
tracking.
5. Make
connections
from the
high voltage
probe
to the multimeter
in
accordance
with the operatoCs
manual.
The meter should
be set for
reading
DC voltage on the 20 volt full scale.
6. Attach
the
high
voltage
probe
ground
lead to
the
cabinet.
While
depressing
the safety
switch
lever, touch
the ionizer
wire support
bar
with end of the high voltage
probe (Figure
10). The meter reading should
be 6.2 kVDC ± .2 kVDC,
7. If no voltage
is measured,
remove the first cell and check the second cell.
The meter should
read 6.2 kVDC ± .2 kVDC.
8. If proper voltage
is measured,
the first cell is shorted.
Refer to Table 1, on
page 12.