Configuring The Source Side Of A Point-To-Multipoint Unstructured Ces Soft Pvc - Cisco Catalyst 8540 MSR Configuration Manual

Atm switch router software configuration guide
Hide thumbs Also See for Catalyst 8540 MSR:
Table of Contents

Advertisement

Chapter 19
Configuring Circuit Emulation Services
Reenable the destination CES interface.
Step 7
Dest_One(config-if)# no shutdown
Switch(config-if)#
Next, configure the source side of the point-to-multipoint unstructured CES connection.

Configuring the Source Side of a Point-to-Multipoint Unstructured CES Soft PVC

To configure the source side of a point-to-multipoint unstructured CES soft PVC connection, perform
the following steps, beginning in privileged EXEC mode:
Command
Step 1
Dest_One# show ces addresses
Step 2
Source# configure terminal
Source(config)#
Step 3
Source(config)# interface cbr card/subcard/port
Source(config-if)#
Step 4
Source(config-if)# ces pvc circuit-id p2mp
Source(ces-p2mp)#
Step 5
Source(ces-p2mp)# party leaf-reference
ref-number
Source(ces-p2mp-party)#
Step 6
Source(ces-p2mp-party)# dest-address
ces-address dest-vpi dest-vci
The following configuration example uses the interfaces and addresses displayed in
Note
To configure the source side of the point-to-multipoint unstructured CES connections using the
interfaces and addresses in
Step 1
Determine the CES addresses of the Dest_One and Dest_Two destination switches as follows:
For switch Dest_One:
Dest_One# show ces address
CES-IWF ATM Address(es):
47.0091.8100.0000.0003.6bb4.c501.4000.0c80.9030.10
Dest_One#
OL-7396-01
Purpose
Determines the destination CES address.
Enters configuration mode from the terminal.
Selects the CES interface to be configured.
Specifies the CBR interface circuit identifier and
changes to CES point-to-multipoint
configuration mode.
Configures the point-to-multipoint leaf reference
number for each party and changes to
point-to-multipoint party configuration mode.
Configures the destination CES address and
destination VPI and destination VCI for each
party.
Figure
19-10, follow these steps:
ATM Switch Router Software Configuration Guide
Configuring Point-to-Multipoint CES Soft PVC Connections
CBR1/1/0:0
vpi 0 vci 16
Figure
19-10.
19-67

Advertisement

Table of Contents
loading

This manual is also suitable for:

Catalyst 8510 msrLightstream 1010

Table of Contents