Beckett Afii Burner; Vii. System Start-Up - Burnham LEDV SERIES Installation & Service Instructions Manual

Ledv series direct vent oil fired boiler
Table of Contents

Advertisement

VII. System Start-up

All boilers equipped with burner swing door have a potential hazard w hich can cause severe
property damage, personal injury or loss of life if ignored. Before opening swing door, turn off
service switch to boiler to prevent accidental firing of burner outside the combustion chamber.
Be sure to tighten swing door fastener completely when service is completed.
A.
ALWAYS INSPECT INSTALLATION BEFORE
STARTING BURNER.
B
. FILL HEATING SYSTEM WITH WATER. Refer to
Section III, G.
C.
CHECK CONTROLS, WIRING AND BURNER to be
sure that all connections are tight and burner is rigid,
that all electrical connections have been completed and
fuses installed, and that oil tank is filled and oil lines
have been tested.
D
. LUBRICATION — Follow instruction on burner and
circulator label to lubricate, if oil lubricated. Most
motors currently used on residential type burners
employ permanently lubricated bearings and thus do
not require any field lubrication. Water lubricated
circulators do not need field lubrication.
Do not over-lubricate. This can cause as much trouble
as no lubrication at all.
E
. SET CONTROLS with burner service switch turned
"OFF".
1. SET ROOM THERMOSTAT about 10° above
room temperature.
2. PRESS RED RESET BUTTON on R8184P Oil
Primary Control and release.
3. Set high limit dial on L8148 at temperature to suit
requirements of installation.
TAB LE 4 : BE C KETT AFII BURN ER
Boiler
Firing Rate
Model
(GPH)
LEDV -1
0.60
LEDV -2
1.00
LEDV -3
1.25
Air Tube
Burner
Com bination
AFII 85
HLX 50HD
AFII 150
HLX5 0HE
AFII 150
HLX5 0HE
WARNING
F
. BURNER START-UP
1. VERIFY burner settings.
a. Refer to Table 4.
2. Open all shut-off valves in the oil supply line to the
burner.
3. Attach a plastic hose to fuel pump vent fitting and
provide a container to catch the oil.
4. REMOVE GAUGE PORT PLUG from fuel pump
and install pressure gauge.
5. REMOVE TEST PLUG IN FLUE COLLAR.
6. Close the service switch to start the burner. If the
burner does not start immediately, check the
manual overload switch on the motor, if so
equipped, and the safety switch of the burner
primary control.
Delavan Nozzle
A ir
0.50 x 70° B
2.5
0.85 x 60° B
3.5
1.00 x 60° B
4.0
22
Settings
Head
Pump Pr essu re
(stop s crew)
(P SIG)
#2
140
#3
140
#5
140

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ledv-1Ledv-2Ledv-3

Table of Contents