The bus bars and power bus boxes ship with a cable bracket. When routing network
cables, you can use the bracket and cable clamps to secure cables and clear the path
for opening and closing the bus bars.
When installing power bus boxes, you can use the bracket and tie-wraps to secure the
bus boxes to the rack. For cable bracket installation with power bus boxes, refer to
the documentation that ships with the power bus boxes.
To install the cable bracket for scalable and mini bus bars:
1. Using the marks you made when measuring with the template, install the cage
nuts, if you have not done so already.
2. Align the cable bracket with the cage nuts.
3. Install the cable bracket on the rack (1).
4. Tighten the thumbscrews (2). Cage nuts for these locations should have been
installed during the "Installing the Rack Rails and Cage Nuts" procedure in
Chapter 3, "Installing System Hardware."
Figure 4-17: Installing the cable bracket