Hot-Plug Power Supplies - HP BL20p - ProLiant - G2 Setup And Installation Manual

Hp proliant bl p-class system setup and installation guide
Hide thumbs Also See for BL20p - ProLiant - G2:
Table of Contents

Advertisement

Installing System Hardware
Figure 3-6: Loading a server blade enclosure, with
blanks, into the rack
6. Repeat steps 1 through 5 for subsequent enclosures.
After installing enclosures, you can install hot-plug power supplies and interconnects.
Refer to the "Hot-Plug Power Supplies" and "Interconnects" sections in this chapter.
You can also perform some cabling procedures. Refer to Chapter 4, "Cabling and
Powering Up the System."

Hot-Plug Power Supplies

Hot-plug power supplies convert AC input power to -48 VDC output power for use
by the server blade enclosure. All power enclosure models use the standard hot-plug
power supply.
3-8
HP ProLiant BL p-Class System Setup and Installation Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant bl p-class

Table of Contents