Toshiba A100 VA3 - Satellite - Pentium Dual Core 1.6 GHz Maintenance Manual page 60

Maintenance manual
Hide thumbs Also See for A100 VA3 - Satellite - Pentium Dual Core 1.6 GHz:
Table of Contents

Advertisement

2.4 System Board Troubleshooting
Procedure 2
Debug Port (D port) Check on Boot Mode
Check the D port status by a debug port test. The tool for debug port test is shown below.
The test procedures are follows:
1. Connect the debug test cable to the connector PJ325 of the system board. For
disassembling to connect the test cable, refer to Chapter 4.
2. Connect the debug port test cable and RS-232C cross-cable to the test board.
3. Connect the RS-232C cross-cable to the PC that displays the results.
4. Boot the computer in MS-DOS mode.
5. Execute GETDPORT.COM in the text menu in CPU REAL mode. (Insert the FD for
starting D port into FDD and input "FD starting drive:>dport".)
The D port status is displayed in the following form:
6. When the D port status is FFFFh (normal status), go to Procedure 3.
7. When the D port status falls into any status in Table 2-3, execute Check 1.
PORTEGE A100 Maintenance Manual (960-460)
Figure 2-2 A set of tool for debug port test
2 Troubleshooting Procedures
PJ2000
2-19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Portege a100

Table of Contents