Stacking - NETGEAR GSM7352SNA - Prosafe 48 Port Gigabit L3 Managed Stackable Switch Installation Manual

Managed stackable layer 3 switches
Table of Contents

Advertisement

Managed Stackable Layer 3 Switches GSM7328S, GSM7352S and GSM7328FS Hardware Instal-

Stacking

You can connect up to eight switches to form a stack with a single management IP
address. The switches automatically select a master unit. Once the master is
selected, you can use its console to manage all the switches in the stack.
Two of the I/O module slots can be used for stacking, while the remaining two I/O
module bays can be used for 10-Gigabit Ethernet uplinks.
To set up a stack:
1. Install up to two 24-Gigabit Stackable Modules (AX742) into the high-speed
I/O module bays at the front or the rear of each switch.
2. Connect the provided stacking cable between a pair of AX742 modules in
each switch within a stack.
Figure 3-5
3. Connect each switch to the next in a cascade to build the backplane of the
stack. Finally, connect the last switch in the stack to the first switch, to close
the ring and provide redundancy and resiliency to the stack.
The switches automatically select the master switch in the stack.
4. To use the console and Command Line Interface (CLI), use a serial cable to
connect the console to the master switch. This single console connection lets
you manage all the switches in the stack.
For information about working with the CLI, see the Command Line Interface
Reference for the ProSafe 7300S Series Layer-3 Stackable Switches on the
Resource CD that shipped with your product.
Hardware Installation
AX724 stacking cable
v1.0, February 2007
3-9

Advertisement

Table of Contents
loading

Table of Contents