Working With Backup Plans And Tasks; Actions On Backup Plans And Tasks - ACRONIS BACKUP AND RECOVERY 10 ADVANCED SERVER SBS EDITION - UPDATE 3 User Manual

Hide thumbs Also See for BACKUP AND RECOVERY 10 ADVANCED SERVER SBS EDITION - UPDATE 3:
Table of Contents

Advertisement

2
Warning
3
OK
6.1.2.2

Working with backup plans and tasks

Actions on backup plans and tasks

The following is a guideline for you to perform operations with backup plans and tasks.
To
Create a new backup plan,
or a task
View details of a plan/task
View plan's/task's log
179
Last result is "Succeeded
with warning"
Last result is
"Succeeded", "-", or
"Stopped"
Do
Click
New, then select one of the following:
Backup plan (p. 188)
Recovery task (p. 212)
Validation task (p. 233)
Backup plan
Click
View details.
In the Plan Details (p. 185) window, review the plan details.
Task
Click
View details.
In the Task Details (p. 183) window, review the task details.
Backup plan
Click
View log.
You will be taken to the Log (p. 186) view containing the list of the plan-related
log entries.
Task
Click
View log.
You will be taken to the Log (p. 186) view containing the list of the task-related
log entries.
View the log to read the warnings -> [optionally] Perform
actions to prevent the future warnings or failure.
No action is required.
The "-" state means that the task has never been started or has
been started, but has not finished yet and so its result is not
available.
Copyright © Acronis, Inc., 2000-2010

Advertisement

Table of Contents
loading

This manual is also suitable for:

Backup & recovery 10 advanced server sbs edition

Table of Contents