Maintenance - Briggs & Stratton 200 AMP AUTOMATIC TRANSFER SWITCH Installation And Operator's Manual

200 amp automatic transfer switch
Hide thumbs Also See for 200 AMP AUTOMATIC TRANSFER SWITCH:
Table of Contents

Advertisement

Available languages

Available languages

Testing the Automatic Transfer Switch
Turn the service disconnect feeding the transfer switch
contactor to the "Off" position. The system's automatic
sequence will initiate. To return to utility power, turn the
service disconnect to the "On" position.
Utility Fail
The generator senses when utility voltage is below
70 percent of nominal. Engine start sequence is initiated
after 6 second time delay.
Engine Warm-Up
Time delay to allow for engine warm-up before transfer. Use
jumper on control board to select delay of 20 seconds or
50 seconds.
Transfer
Transfer from utility to generator supply occurs after voltage
is above set levels. Minimum engine run time is 5 minutes
after transfer.
Utility Pickup
Voltage pickup level is 80 percent of nominal voltage.
Retransfer
Retransfer from generator to utility power is approximately
10 seconds after utility voltage supply is above pickup level
and minimum run time is completed.
Engine Cool Down
Engine will run for 60 seconds after retransfer.

Maintenance

The transfer switch is designed to be maintenance free under
normal usage. However, inspection and maintenance checks
should be made on a regular basis. Maintenance will consist
mainly of keeping the transfer switch clean.
Visual inspections should be done at least once a month.
Access to transfer switch must not be obstructed. Keep
3 feet (92 cm) clearance around transfer switch. Check
for an accumulation of dirt, moisture and/or corrosion
on and around the enclosure, loose parts/hardware,
cracks and/or discoloration to insulation, and damaged or
discolored components.
Exercise the transfer switch at least once every three months
as described in Testing the Automatic Transfer Switch unless
a power outage occurs and home generator system has gone
through an automatic sequence. Allow generator to run for at
least 30 minutes.
Contact a licensed electrical professional to inspect and clean
the inside of the enclosure and other components of your
home generator system at least once a year.
When Calling for Assistance
You must have the Model Number and Serial Number from
the unit ID label at hand if it is necessary to contact a local
service center regarding service or repair of this unit. Obtain
this information from the unit ID label located on or inside
the enclosure.
To contact Briggs & Stratton call (800) 743-4115, between
8:00 AM and 5:00 PM CT.
Installation Inspection
Before placing the system into service, inspect the entire
installation carefully.
Complete the "Installation Checklist" supplied with the
generator as you make the inspection. Ensure all items have
been filled-in and all signatures have been obtained. Instruct
the owner to mail the white copy to:
Warranty Registration
P. O. Box 239
Jefferson, WI 53549
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents