Install The Switch; Check The Installation - NETGEAR GSM7228PS-100NAS Hardware Installation Manual

Gsm7200ps series gsm7300s series managed stackable switches
Table of Contents

Advertisement

Managed Stackable Switches GSM7200PS and GSM7300S Series Hardware Installation Guide

Install the Switch

You can install the switch on a flat surface or in a standard 19-inch rack.
Installing the Switch on a Flat Surface
The switch ships with four self-adhesive rubber footpads. Stick one rubber footpad on
each of the four concave spaces on the bottom of the switch. The rubber footpads
cushion the switch against shock and vibrations.
Installing the Switch in a Rack
To install the switch in a rack, you will need the 19-inch rack-mount kit supplied with your
switch.
1.
Attach the supplied mounting brackets to the side of the switch.
2.
Use the provided Phillips head screws to fasten the brackets to the sides of the
switch.
Figure 2-9 Installing the Switch in a Rack
3.
Tighten the screws with a No. 1 Phillips screwdriver to secure each bracket.
4.
Align the bracket and rack holes. Use two pan-head screws with nylon washers to
fasten each bracket to the rack.
5.
Tighten the screws with a No. 2 Phillips screwdriver to secure the switch in the rack.

Check the Installation

Before you apply power, perform the following checks:
1.
Inspect the equipment thoroughly.
20 |
Chapter 2: Hardware Installation
mounting
bracket

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gsm7228psGsm7252psGsm7328sGsm7352s

Table of Contents