Verifying Installation - Cisco 888 G.SHDSL Router with 3G - 888 G.SHDSL Router Hardware Installation Manual

800 series routers
Hide thumbs Also See for 888 G.SHDSL Router with 3G - 888 G.SHDSL Router:
Table of Contents

Advertisement

Verifying Installation

Figure 2-12 Mounting Router on Wall
1. Secure two screws 7
(19.35 cm) apart in a wall
1
and
in. (0.32 cm) from
8
the wall.
Wall
Wall-mount
screw
Wall
Verifying Installation
Verify the cable connections (links) by checking the LEDs listed in
see Chapter 3, "Troubleshooting."
The LINK LED is on the back panel of Cisco 801 and Cisco 802 routers.
Cisco 800 Series Routers Hardware Installation Guide
2-20
5
inches
8
m )
5 c
9 . 3
( 1
i n .
5
8
7
1
in. (0.32 cm)
8
Screw
Maximum distance
6 ft (18 m)
Wall-mount
screw
3. Place power supply
on horizontal surface.
Chapter 2
Installation
Front panel
Mounting
brackets
2. Hang router
on screws.
Table
2-4. If the LEDs are not on,
78-5373-04

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents