Omron WS02-NSFC1-EV3 - 12-2007 Operation Manual page 38

Table of Contents

Advertisement

Merging Projects
1,2,3...
Execute the "Setup.exe" file in \Utility\English\ProjectMergeTool\disk1 on the
CDROM to install it.
When merging projects, make the following settings when building the project
on the Face Plate Auto-Builder for NS so that the same resources are not
used by both projects. Confirm the build conditions in 4.1 Basic Operation for
details on settings.
• First screen number
• First unit number
• First data log number
• First confirmation message number
Note Observe the following precaution when merging projects with the NS Project
Merge Tool.
• The NS Project Merge Tool does not support version 6.6 projects. Follow
the procedure described in 4-2-1 Merge Using the CX-Designer to merge
version 6.6 projects.
• The SMART Active Parts will not function if a project (called project A)
that was output with the Enable for Making Detail Setting Screen of Seg-
ment Program 2 option selected is merged with a project (called project
B) in which SMART Active Parts were pasted.
Use the following procedure to successfully merge projects like these.
1. Delete all of the SMART Active Parts from project B.
2. Save project B.
3. Merge the two projects with project A as the base project and project B as
the merge project.
4. Paste the SMART Active Parts into the merged project.
Section 4-2
23

Advertisement

Table of Contents
loading

Table of Contents