Omron SFC - INTRODUCTION GUIDE Introduction Manual page 24

Table of Contents

Advertisement

2-5 Creating Steps and Transitions
2 Rename the transition.
Here, the transition represents the condition
for making a transition from the Initial Step
process to the following Issue Ticket process.
Double-click Trans1.
2
Trans1 will be selected.
•If the transition is not selected, click on a blank
area of the SFC view, and retry.
•Transitions can be renamed without affecting
operation.
•Transition names can be hidden.
Select Tools - Options. The Options dialog
box will be displayed. Uncheck Show
Transition Name on the SFC tab.
Type "Vehicle Detection Flag", and press the
Enter key.
The transition will be renamed.
3 Rename the step.
In this example, the step represents the ticket
issuing process.
Right-click Step2, and select Edit Step Name
from the pop-up menu.
Type "Issue Ticket", and press the Enter key.
The step will be renamed.
2-14
o

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sfc

Table of Contents