Omron CX-ONE - INTRODUCTION GUIDE Introduction Manual page 8

Fa integrated tool package
Table of Contents

Advertisement

Use the following procedure to execute an integrated simulation of the ladder program and PT
(touch panel) screen. For details, refer to the CX-Designer Operation Manual (V088).
1.
Create the screen data in the CX-Designer.
2.
Click the
Icon or select Tools – Integrated Simulation. The PLC-PT Integrated Simulation
Dialog Box will be displayed.
3.
Click the Browse Button and select the desired ladder program (CXP) file.
4.
Click the Start Button. The PLC-PT Integrated Simulation will start automatically.
5.
The test window will be displayed.
The Test Tool Window will list all of the communications addresses being used in the displayed
screen. For example, when "Host SERIAL A" is connected to the CX-Simulator, the CX-
Simulator value is reflected in the SERIAL A communications address. (The values can also be
changed.)
Test Window
Integrated Simulation Procedure
Test Tool

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cx-one

Table of Contents