Omron CX-ONE - INTRODUCTION GUIDE Introduction Manual page 40

Fa integrated tool package
Table of Contents

Advertisement

Start-Up /
Program
Adjustment On-
Modification
site
Click [I/O Table/Unit
Setting]
Double-click the
registered AD Unit
Click [Compare] button
Click
Unit
Parameter
Change
Unit Parameter Change and Verification
Unit Parameter Change and Verification
After modification on-site, you can verify it with the designed Unit parameter and display the
differences graphically. This allows for easier checking of the parts modified on-site.
1. Read the designed program. In this example, read "Sample1".
Then connect online. (If you have already read it in the previous section's operation, this is not
required)
Open the I/O Table/ Unit setting, then double-click the AD Unit.
2. Click the [Compare] button.
Now you can see the difference between the designed Unit parameters and the configured
parameters in the machine.
3. Unmatched detail differences can also be checked.
You have now completed Chapter 2: Example of PLC System Construc
You have now completed Chapter 2: Example of PLC System Construc
The next chapter describes PLC network construction flow.
The next chapter describes PLC network construction flow.
You can check the
You can check the
number of unmatched
number of unmatched
items.
items.
Unmatched items are
Unmatched items are
shown in orange.
shown in orange.
After checking the
After checking the
unmatched details, Unit
unmatched details, Unit
parameters can be easily
parameters can be easily
modified.
modified.
tion by CX
-
One.
tion by CX
-
One.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cx-one

Table of Contents