Installing The Main Battery Pack - Emerson FB2100 Instruction Manual

Flow computer
Hide thumbs Also See for FB2100:
Table of Contents

Advertisement

2.10.2.1

Installing the Main Battery Pack

If you purchased one of the battery/solar panel options, you need to install the main
battery pack before you place the device in service.
The device provides a battery cable with two pairs of battery connectors, enabling you to
hot-swap the battery pack in a non-hazardous location. You can use either pair of
connectors when you install the battery.
1.
2.
3.
Installation
Remove the battery pack from its packaging.
Remove the plastic tabs covering the connectors on the battery pack.
Figure 2-25.
Removing Plastic Tabs from Battery Pack
Open the enclosure.
FB2100 Flow Computer Instruction Manual
D301783X012
November 2023
39

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fb2200

Table of Contents