Assembly Instructions - MULTIQUIP MIX N' GO MC3PBAT Operation Manual

Mini concrete plastic drum mixer
Table of Contents

Advertisement

ASSEMBLY
1. Remove the mixer drum and associated components
from the packing container (Figure 5).
componets are enclosed in the shipping container.
„ Wheels (2), Cotter Pins (2), Washers (2)
„ Mixing Drum, Battery
„ Frame (Controller, Gearbox and Axle)
Figure 5. Shipping Container
Wheel Installation
1. Remove both wheels and wheel retaining hardware
from the shipping container.
2. Position wheels over axle, install washers, secure with
cotter pins Figure 6.
COTTER PIN
WASHER
AXLE
Figure 6. Wheel Installation
MIX N' GO MIXER • MC3PBAT • OPERATION MANUAL — REV. #0 (04/09/24) — PAGE 15
The following
PNEUMATIC TIRE
COTTER PIN
WASHER

ASSEMBLY INSTRUCTIONS

Top Cover Installation
1. Place the mixer frame on a secure level surface, and
attach the top cover as shown in Figure 7.
TOP COVER
M8 NUT
Figure 7. Top Cover Placement
Drum Installation
NOTICE
DO NOT spin the drum on fast, as this may damage
the gearbox.
Fit the mixing drum onto gearbox shaft as shown in Figure 8.
Rotate drum in a clockwise direction, make sure the drum
fits right up to the shoulder on the gearbox shaft.
GEARBOX SHAFT
Figure 8. Mixing Drum Installation
M8 BOLT
FRAME
CLOCKWISE ROTATION

Advertisement

Table of Contents
loading

Table of Contents