One Connect; Ocb Power On Sequence Test - Samsung FRAME UA43LS03NAK Service Manual

Chassis: uwy81
Table of Contents

Advertisement

4-7. One Connect

4-7-1. OCB POWER ON SEQUENCE TEST

1.
Connect OCB to TV & Place in Power Standby
A13V
for 12.8Vdc on pins 7,8,9,10
9
2.
Press TV "Power On" by Remote Control or TV Function Assy
PS_ON
pin 3 .2Vdc (when off) changes to 3.3Vdc (on)
9
NOTE
Will stay On for short time when powered off.
3.
If PS_ON Error (won't change or missing voltages)
OCB Cable Connection to the TV.
9
Should hear OCB relay activate with cable connection.
4.
If PS_ON is OK
B350
for approx 346Vdc at pins 15 & 16 is activated.
9
while using important B-GND reference at pins 19 & 20
If missing perform "OCB Self Power Supply Test"
4. Troubleshooting
CNM803
Main Connector (POWER)
4-23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Frame ua49ls03nakFrame ua55ls03nakFrame ua65ls03nak

Table of Contents