Gas Connection; Air Supply And Flue - A.O. Smith cyclone BFC - 80 Installation And Service Manual

A.o. smith gas water heater installation user and service manual
Table of Contents

Advertisement

3
3.8

Gas connection

3.9

Air supply and flue

3.9.1
3.9.2
26
Installation
Warning
The installation should be carried out by an authorised installation engineer,
in compliance with general and local regulations
Caution
Make sure that the diameter and length of the gas supply pipe are large
enough to supply sufficient capacity to the appliance.
See (D) in the installation diagram
1. Fit a manual gas valve (10) in the gas supply pipe.
2. Blow the gas pipe clean before use.
3. Close the manual gas valve.
4. Fit the gas supply pipe to the gas control.
Warning
After fitting, check for leaks.
Introduction
This section covers the following subjects:
Requirements for flue gas discharge materials
Concentric connections
Parallel connections
Requirements for flue gas discharge materials
Warning
The installation should be carried out by an authorised installation engineer,
in compliance with general and local regulations
Depending on the approved installation types, there are several alternatives for
connecting the air supply and flue gas discharge.
The appliances are approved for installation types B23, C13, C33, C43, C53
and C63.
The figure and table give information about these appliance types. For an
explanation of the possibilities, please contact the manufacturer.
(1.3
"Regulations").
(3.5 "Installation
diagram").
(1.3
"Regulations").
Instruction manual BFC
is

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cyclone bfc -100Сyclone bfc-100

Table of Contents