Siemens SICHARGE D Product Information page 84

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 6
Installing the cable management
Installing the cable clamp
The following operating instruction shows how to install a cable clamp of the cable management system.
Rubber sphere
Rope
Meander pin
Cable clamp
Figure 8
Cable clamp overview
Note
Do not pull on the rope with force
Do not pull on the rope with force during the installation of the cable clamp. The spring force and the rope stopping mechanism
can cause injuries or damage to the cable management system.
1.
The number of windings depends on the cable type. Refer to the table for the number of windings.
Measure 2.4 m from the cable outlet of the charging plug. Clean the area with the grease-dissolving cleaner and cloth. Wrap the
rubber adhesive tape
Cable type
EV-T2M4CC-DC250A-...
EV-T2HPCC-DC500A-...
SEVS20-003(S)B_SEVD-02E-...
Figure 9
Wrapping tape around the charging cable
84
overlapping around the charging cable
M4x14 hexagon socket-head screw
M4 hexagon nut
Rubber adhesive tape, self-adhesive on one side
Charging cable
at this point. Cut off unneeded rubber adhesive tape.
Installation of the cable management system
A5E53160522-AA, 11/2023
Number of windings
3.5
2
5

Advertisement

Table of Contents
loading

Table of Contents